FRESH SOD. A FRESH START.
Bare dirt or patchy grass shouldn’t be the view from your back door. Start fresh with sod installation planned around your soil, your space and the way you use your yard.
A LAWN THAT STARTS WITH A PLAN
A new-build dirt lot. A lawn full of thin spots. A side yard you’d like to use. Whatever your starting point, the goal is more than green grass: it’s a yard that fits everyday life.
NEW-CONSTRUCTION YARDS
PATCHY LAWN REPLACEMENT
SIDE-YARD REFRESHES
WHAT’S INCLUDED
We’ll look at the whole picture before the first roll goes down. Your quote will spell out the work your yard needs.
PLAN THE SPACE
Talk through your goals, sunlight, access and the areas you want to turn into lawn
PREPARE THE GROUND
Identify existing material to remove and the soil preparation needed before installation.
CHECK THE FOUNDATION
Look for low spots and discuss whether separate grading or drainage work belongs in the plan.
BRING IN THE GREEN
Plan the layout, fit the sod to your lawn area and finish the edges around beds and paths.
START OFF RIGHT
Know what to ask about watering, foot traffic and the first mow as your lawn takes root.
Tell us what your yard looks like today
WHY IT MATTERS IN NORTHERN COLORADO
A lawn needs more than a fresh layer of grass. Soil condition, surface drainage and establishment watering all deserve a place in the plan before installation begins.
WHEN TO INSTALL SOD
Season, site conditions and your ability to water all matter. Let’s talk about when you’d like to use the yard and what it needs to get there.
New sod needs establishment watering. Water access and local requirements should be discussed before work starts.
Installation timing depends on workable ground and suitable conditions, not just an open spot on the calendar.
Plan for lighter use while roots establish. Ask when it’s appropriate to mow, walk and let pets back on the lawn.
AREAS WE SERVE
Sod installation for homeowners across our Northern Colorado service area.
Fort Collins
Windsor
Loveland
Wellington
Severance
Cost, timing and those first few weeks. Here’s a helpful starting point before your walk-through.
Cost depends on the size of the lawn, access, existing material and the preparation your site needs. A walk-through helps us put together a free, itemized quote for your space.
Yes. We can discuss sod as part of a plan for a new-construction yard. Grade, access and any other outdoor work should be considered before the lawn goes in.
Keep traffic light while roots establish. Timing varies with weather, watering and growing conditions, so ask for guidance specific to your installation before returning to normal use.
Fresh sod needs regular establishment watering. The schedule depends on the season, soil, sod and local requirements. Discuss water access and a suitable plan before installation.
Sod is living grass and needs mowing and watering. Artificial turf has different installation, cleaning and maintenance needs. The right choice depends on your budget, sun exposure and how you use the yard.
Tell us about your yard. We’ll start with a free walk-through and a clear, itemized quote. No pressure to move forward.